ASLAN Contracting & Transportation is an authorized distributor and applicator of AAC blocks in Qatar. We take AAC orders directly, have them produced to the project’s specification, and supply, deliver and install them as one company. More about our AAC block supply in Qatar.
How AAC reaches your site:
1. Material submittal: we prepare the AAC material submittal for consultant approval (certified to BS EN 771-4).
2. Made to your specification: blocks are produced to the project’s density class and thickness, G2 or G4, from 100 to 300 mm.
3. Supply from our warehouse in Qatar: AAC blocks, lintels and thin-bed adhesive.
4. Delivery: on our own flatbed trailers, on strapped wooden pallets.
5. Offloading: agreed with the client before delivery. AAC is lifted from underneath the pallet by forklift or crane, never by clamp.
ASLAN supplies AAC blocks for residential and commercial projects across Qatar, either supply only or supply and installation. Our services as a supplier:
1. Made-to-order supply: as an authorized distributor, we place your order with the plant and have it produced to the project’s specification.
2. Quantity estimate: estimate blocks, volume, adhesive and pallets with our AAC block calculator.
3. Technical support: answers for consultants and engineers from our approved material submittal, including thermal values and wall length limits.
4. Delivery and offloading planning: delivery date and offloading arrangement confirmed before dispatch.
5. Supply and installation: one company responsible for the material and the finished wall. See our AAC block supply and apply service.
ASLAN installs AAC blocks with its own crews, so one company is responsible for both the material and the finished wall. Our installation steps:
1. First course: laid on conventional mortar to level the slab and give every course above a level start.
2. Thin-bed adhesive: 3 to 5 mm in every horizontal and vertical joint, which keeps the wall’s thermal performance and fire rating.
3. Cutting on site: blocks cut for openings and services.
4. Frame junctions: mesh fixed over the junction with the concrete frame before plastering, about 10 cm onto each side, galvanized metal or fibreglass depending on the plaster.
5. Wall limits: load-bearing walls use G4 blocks, approved in Qatar up to G+2; non-load-bearing infill walls are kept within the QCS length and area limits.
6. Crew supervision: every new crew is supervised on its first day on site.
Quality Assurance
Every figure we give a consultant comes from our approved AAC material submittal, and every new crew is supervised on its first day on site.